Core Consulting
main
about CCG
plan & schedule
estimating & cost
PMO services
case studies
innovations
contact CCG
innovations :White Papers / Articles / Conference Papers / Planning & Scheduling Useful Tools
MSP - How to Guides
The following documents have been developed as practical guides in the use of Microsoft Project in the areas of planning, resourcing and cost, updating and presentation.  Please feel free to download, keep and use them. If you have suggestions for their improvement, please let us know and we can update as appropriate.
MSP How to Guide 1 Basic Planning: Guide 1 covers the fundamental elements of planning using MSP. Initial configuration, and software settings, getting started and getting the basics right.
MSP How to Guide 2 Resources and Cost: Are you interested in driving your cost estimate from your schedule? This guide shows you how to assign and level resources, apply and model fixed cost and report planned resource usage and cost.
MSP How to Guide 3 Updating: One of the less well understood aspects of scheduling, tracking and updating is made simple in this guide. Covered in here is tracking theory,  actual/ remaining duration method, actual / remaining work method and suggested progress reports.
MSP How to Guide 4 Presentation: Have you ever been frustrated trying to present information from MSP? This guide offers tips for filter, grouping, formatting, drawing and printing.
MSP Template
This Microsoft Project Template includes the CCG Health Check Toolbar. The toolbar has been developed to enable effective health checking of schedules. The template is considered "Open Source", any innovations or feedback would be appreciated. There is also a pdf guide to explain each of the checks. MSP Template   Guide

 
  • Copyright
  • Privacy Policy
  • Terms and Conditions
copyright © core consulting group 2010 | created by weboo - web solution specialists